144 Professional Dr. #1
Cabot, AR, 72023

(501)843-1553

fax: (501)843-1566

 

Valley View High School:

Valley View High School, Jonesboro, AR

83,439 square foot new school building. Conditioned by 191 tons of geo-exchange heat pumps. Photo below shows the plate and frame heat echanger which transfers heat between the open loop and building closed loop. Open loop pumps from a series of wells and dumps into others, requiring less wells than a closed loop system. Again note small pump size required for this system.

  


The Firm

HVAC Design

Plumbing Design

Electrical Design

Lighting Design

Energy Analysis

Serving

Architects

Contractors

Owners

home | projects | personnel | ftp site